The mentioned Valencia Apartment located in Taman Sri Muda Section 25 Shah Alam has been taken. The landlord had carried out Asset Enhancement Initiatives (AEI) to ensure adequate comfort-ability to the tenants.
The SYABAS meter and its piping that fixed by SYABAS's contractor is not giving the right pressure and flow. It was changed to a PVC piping by a professional plumber.
 |
Before |
 |
After |
Additional ceiling fan point and new fan for 1 of the rooms, so that every room has a ceiling fan. Meantime, a ceiling fan that was very noisy is being replaced as well.
Wear and tear items like drainage piping from basin and switches were replaced for safety and total functionality.
 |
before |
 |
after |
 |
before |
 |
after |
 |
before |
 |
after |
The renovation and repair works were carried out by panel contractors by the landlord to ensure satisfactory of the tenant.
No comments:
Post a Comment